LINACRE METHODIST MISSION |
THE BEACON PROJECT - PHASE ONE |
| Home About us History Worship Links |
|
|
![]() |
Many areas of Linacre have been given
a facelift but our tour of the Phase One work starts in the kitchen. This is how it used to look. |
| Kitchen during refurbishment | ![]() |
![]() |
Here is the new kitchen after the refurbishment. It is fitted with new stainless steel work surfaces, new gas cooker, a dish washer and new extractor. |
| We now move to the Bowden Street entrance
to see the before and after building work |
![]() |
![]() |
Building work in progress in Bowden Street entrance (looking towards the notice board area) |
| Bowden Street entrance being renovated | ![]() |
![]() |
Bowden Street corridor showing the new ramp down to the ladies toilet |
| Vic and Archie come in through the new Bowden Street entrance |
![]() |
![]() |
Val demonstrates the new wheelchair lift
situated at the Bowden Street entrance |
| The new Bowden Street entrance showing the new wheelchair lift on the left |
![]() |
![]() |
The new Bowden Street entrance showing the new choir room doors and to the right the main hall doorway |
| Our tour now takes us to the Choir room before
refurbishment this is looking towards the vestry |
![]() |
![]() |
Old Choir room showing the steps towards the vestry |
| The new Choir room looking towards the
vestry notice how the steps have now gone |
![]() |
![]() |
The new Choir room looking towards the Main Hall
again no steps everything is now on the same level |
| The Wesley Lounge looking resplendant after its new makeover |
![]() |
![]() |
The new style of notice board is now
in place at the front of the Church |
| The exterior of the Church during its renovation work | ![]() |
![]() |
The exterior of the building looks
good after the new paint job |
| Phase One of the work is officially opened by Councillor Darren Hardy with Minister Ann Hall in attendance Saturday 31st March 2007 |
![]() |