Phase three of the redevelopment work involves work to the rooms and access areas at the rear of the building namely the Lower Hall, Upper Hall and Balliol Chapel. Plans for redeveloping the community rooms with work hopefully beginning in 2010. Phase 3 objectives
|
![]() |
|
|
Here we see an old plan of the Lower Hall.
At present the nearly new shop and stage area have gone |
![]() |
Lower Hall screening to be
replaced with a permanent wall |
| View towards the Balliol chapel from the Lower Hall |
![]() |
![]() |
The Balliol Chapel |
| This is the doorway to the lower room from the lower hall.
This is to be replaced with a new double door |
![]() |
![]() |
Work is to be done on renovating the stairwells |
| Stairwell up to gym | ![]() |
![]() |
The rear stairwell near the gents toilet |
| The Lottery Bid does not include any refurbishment
of the Main Hall, but the intention is to promote the area as a conference centre. |
![]() |
![]() |
The Main Hall showing the extensive seating areas |
| The Upper Hall will have a new foyer area, toilets and will be accessible from downstairs by a lift. |
![]() |
![]() |
The Upper Hall entrance area which
will become the new foyer |
| View of the Upper Hall The tiered seating will remain |
![]() |
![]() |
The Upper Hall is now used
by the Tae-Kwon-do group |
Recommendations:-
1. That we agree to maximum flexibility of rooms, with the possible exception of the requirements of an ‘Anchor Tenant’.
2. That we make maximum use of space to meet current community needs and to increase revenue in the future.
3. That we agree to consider the removal of the pews in the BALLIOL CHAPEL and moving the items that hold particular importance, to a new permanent area within the Mission, to provide an alternative area for worship.